Cuplock Scaffolding Slab Formworks

Cuplock Scaffolding Slab Formworks

  • Buildings, high buildings, business and shopping centers, subway underground stations, industrial structures, energy facilities, hospital health facilities, viaducts, bridges, culverts, HEPP projects, shipyards, stage and events platforms etc. used in projects.
  • Scaffolding system used in different heights.
  • Elements consist of vertical and horizontal elements in different lengths.
  • The cuplock spacings of vertical elements are manufactured as 50 and 100 cm as standard.
  • It can be combined with horizontal elements, 90 ° four from a single connection point.
  • Horizontal elements are manufactured in different sizes according to the slab loads.
  • Can be used as an alternative facade scaffoldings.
  • Stairs and railing elements can be placed between the elements and can be used as bases or as security stairs in the building ceiling.
  • Elements can be used as mobile work scaffolding.
  • Plywood is supported with H20 wooden beam or 10/10 wood on the grid according to H20 wooden beams and slab loads in the woods.
  • Main girders H20 wood beam are placed on the cross-heads or 10/10 wood are placed on U-heads.
  • The slab is supported by diagonal elements to strengthen against the thickness, height and wind loads.
  • Vertical and horizontal elements can be easily dismantled and installed by placing them with hammer aid and human power.
  • High load carrying capacity due to node points.
  • If the vertical elements are connected with 100cm intermediate horizontal elements, they have a carrying capacity of 40kN / leg.
project img
project img
project img
project img
project img
project img
project img
project img
project img
project img
project img
project img
project img
project img
project img
project img
project img